Writing a lab plan of correction on the CMS-2567: the process
A laboratory plan of correction answers every D-tag on the CMS-2567 with four elements CMS requires: action for affected patients, how other affected patients were identified, the systemic change, and how it is monitored, each with a completion date. It is signed by the director or authorized official and returned within 10 calendar days of receipt.

The seven-step process
- Log and triage. Record the date received, count 10 calendar days, list each D-tag and mark condition vs standard. Condition-level tags and any immediate jeopardy come first.
- Read the requirement. Pull the regulation and Appendix C guidance for each tag. Note exactly which words of the rule the finding says were not met.
- Find the root cause. Ask why the failure happened and keep asking until you reach a process cause, not a person. See root cause analysis for lab deficiencies.
- Look back. Define the period and systems affected and search for other patients, results or records with the same problem.
- Design the fix. Change the process so the failure cannot easily recur: procedure revisions, LIS rules, checklists, staffing or supervision.
- Plan monitoring and evidence. Decide what will be audited, by whom, how often and for how long. See evidence and monitoring.
- Write, review, sign, send. Use the template, have the director review, sign and date, keep a copy and send it with proof of delivery.
The four required elements
SOM Chapter 6 §6132.2 lists four elements every plan must contain. The agency checks for them, plus the signature, when it reviews your response. Details on each: the four required elements.
Standard-level vs condition-level answers
Standard-level findings get a plan of correction, which may include future completion dates within 12 months (§493.1816). Condition-level findings get a credible allegation of compliance asserting the correction is already done, with evidence. See allegation of compliance.
Five rules that keep plans from being sent back
- Answer every tag, on its own row, with its own date.
- Name procedures and forms by title and revision, not "policies were updated".
- Use job titles, never personal names, and never blame an individual.
- Never mention another laboratory.
- Promise only monitoring you will actually do and document.
Need help writing your plan of correction?
Sound Lab Consultants helps laboratory directors work through root causes and write plans of correction and allegations of compliance that answer each D-tag.
Related guides on soundlabconsult.com:
Frequently asked questions
What must a CMS-2567 plan of correction include?
For each deficiency: corrective action for affected patients, how other potentially affected patients were identified, the systemic changes made, how corrections are monitored, and a completion date. The director or authorized official signs it.
How long is a lab plan of correction due?
Within 10 calendar days after the laboratory receives Form CMS-2567, per CMS State Operations Manual Chapter 6.
Can a plan of correction include future dates?
Yes, for standard-level deficiencies, if the dates are realistic and within 12 months of the survey. Condition-level findings require an allegation of compliance that the correction is already complete.
Is retraining enough as a correction?
Rarely. Agencies expect a systemic change and monitoring. Retraining alone does not show why the failure happened or how recurrence is prevented.